NOTICE:
Sales Manager Mr. Jiang and Engineer Mr. Tian went to Shanxi in March 12,2017. They installed a set of nitrogen flush continuous band sealer machine.
March 2nd afternoon, 50 sets of fixed mine wagons made by China Coal Group were formally loaded in the Group intelligent equipment workshop after inspection, and would be sent to Changzhi City, Shanxi
February 24, 2017, a batch of chamber vacuum machine produced by Shandong China Coal Group was loaded to send to Shanxi Province.
On the morning of January 14, the second batch of CFD-4 automatic cup filling and sealing machine ordered by Shanxi merchants officially loading in the China Coal industry park, would be sent to Taiyu
a batch of NC4 manual plastic cup filling sealing machine were loaded at Shandong China Coal Group Industry Park and would be sent to Linchuan County, Jincheng City, Shanxi Province.
November 8th afternoon, a batch of U steel arch supports were formally loaded in the industrial park of Shandong China Coal Group, would be sent to Xiangyuan District, Shanxi Province.In March and Jun
©Shandong China Coal New Energy Import Export Co., Ltd. © 2017
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China